Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 12/12/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the Parks and Recreation master Plan.Harold Avenue Generator Mitigation Grant
Last Updated: 12/12/2024 Current Phase: Turnover and Closeout
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue Recreation Center.Mid-County Library Hurricane Repairs
Last Updated: 12/12/2024 Category: County Facilities Current Phase: Construction
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Sheriff Administration and Hardened 911 Facility
Last Updated: 12/12/2024 Category: Sales Tax Funded Category: County Facilities Current Phase: Planning and Project Approval
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Supervisor of Elections Warehouse
Last Updated: 12/12/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Provide new 20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.William R Gaines Jr. Veterans Memorial Park Phase II
Last Updated: 12/12/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
William R. Gaines Jr. Veterans Memorial Park phase II design and construction.Last Updated: 12/11/2024 Category: Roadway Current Phase: Design Development
Gillot Blvd roadway reconstructionBermont Road Box Culverts Rehabilitations -Road and Bridge FY24
Last Updated: 12/10/2024 Category: Bridges Current Phase: Design Development
Road and Bridge FY24 Bridge Rehabilitations Bermont Road - #010003, #010016, #010017, #010020Biscayne Bridge Rehabilitations - Design
Last Updated: 12/10/2024 Category: Bridges Current Phase: Construction
Road and Bridge FY23 Bridge Rehabilitations - #014049 and #014050